The intervention included the construction of a dining area, two restrooms, a kitchen, a resource center, one classroom, and the respective technical rooms. The original roof structure and ceramic tile flooring of the classroom were preserved. Maintenance was performed on the existing septic tank, and the perimeter fence around the sports court was replaced. A section of the sidewalk was repaired and a new one was built; most of the lot was landscaped with grass, and playground equipment was installed. At the request of the local government, additional work was done on the COREDI classroom and the community hall. The roof tiles were replaced in the COREDI classroom, and the interior walls of both buildings were painted.