Adaptation of the playing field and the semicircular area that are part of the baseball diamond facilities in the municipality of San Juan de Urabá. The project also included the construction of two grandstands with their respective covers and two locker rooms, each equipped with 2 sinks, 3 showers, 2 restroom blocks (including one accessible for people with disabilities), and 2 urinals. Additionally, a sidewalk was built connecting the two locker rooms, along with a rectified drainage ditch that replaced an existing one on the premises.
Total Cost: $663.364.217