The intervention aimed to improve the habitability and functionality of the space as a school. All walls were fully plastered and then painted. The hydro-sanitary and electrical networks were replaced, and separate restrooms were built for boys and girls. The school was equipped with a functional kitchen and dining area, and appropriate furniture was provided to meet usage requirements.