Construction of a new single-story building housing a computer center with capacity for up to 50 children, restroom facilities, and the principal’s office. Additionally, two existing buildings were renovated; these include 3 classrooms, a kitchen, and a school cafeteria. A prefabricated house was also built as a residence for teachers, featuring 3 bedrooms, a living room, a bathroom, and a kitchen. The project also includes a septic system designed for 160 children, 2 water storage tanks with pumping systems for consumption, a children’s playground, a wire fence enclosure, green areas with trees, and pathways providing access to the school.