Twenty-four classrooms, special classrooms, a library, a playroom and a systems room were built. A total of 1,568 m2 were intervened in the first stage, 1,278 m2 in the second stage, equivalent to the improvement of the existing areas of the school, and 935 m2 in the third stage. This does not include the intervention of the public space and other recreational areas for students, which were fully intervened.